Development · Part-complete schemes
Development finance for part-complete schemes
When a build has stopped — the lender has stepped back, the money has run out or the contractor has gone — a new facility can repay what is owed and fund the work left to do.
How cost-to-complete finance works
A part-complete facility does two jobs in one: it repays the existing lender (or funds the purchase of a part-built site) and it provides the money to finish the build, released in stages as a monitoring surveyor signs off the work. It is development finance for a scheme that has already started, rather than for a bare site.
Lenders size it differently from a new-build facility. They look at what the site is worth today in its part-built state, the independent cost to complete, and the value once finished. The day-one advance is limited by the current value; the total facility is limited by loan-to-cost and loan-to-GDV across the whole scheme. Where the senior lender’s limits leave a gap, a mezzanine layer can sit behind it.
These cases are won or lost on information. A quantity surveyor’s cost-to-complete report, a clear explanation of why the scheme stalled, and a contractor who can finish it give a new lender the confidence to move quickly. We help you put that pack together before any lender sees it.
An illustration of how a facility is sized
Illustrative figures only, not a real case: a scheme with a gross development value of £4m stops halfway. The existing lender is owed £1.4m, the site is valued at £1.9m as it stands, and a quantity surveyor puts the cost to complete at £1.3m including contingency.
A new senior lender might advance enough on day one to repay the £1.4m and then fund most of the £1.3m build in stages. If its loan-to-GDV limit stops short of the full amount, mezzanine finance or a further contribution from the developer closes the gap. We model these options with you before approaching lenders, so you know what each one costs.
Typical situations
- The development lender has stopped funding drawdowns or will not extend
- The facility has expired or is in default before the build is finished
- Build costs have risen and the current facility no longer covers them
- The main contractor has failed and a new contractor must be appointed
- Buying a part-built site from a developer, a receiver or an administrator
- Moving from an expensive bridge to a proper development facility mid-build
What lenders will look at
- An independent cost-to-complete report from a quantity surveyor
- A valuation of the site as it stands, and of the finished scheme
- The redemption statement from the existing lender, including any default interest
- Why the scheme stalled, and what is different now
- The contractor who will finish the build and the revised programme
- Planning, building control and warranty position for the work already done
Related
Related finance
- Lender refinance & stalled sitesReplacing an expiring or exiting lenderRead more
- MezzanineSecond-charge layer behind senior debtRead more
- Developer exitReleasing equity while unsold units sellRead more
- Senior debtFirst-charge funding for land and buildRead more
- Stretched seniorHigher leverage from a single lenderRead more
Questions
Frequently asked questions
Will a lender fund a scheme another lender has walked away from?
Do I need a new cost-to-complete report?
Can the facility cover default interest owed to my current lender?
Can I buy a part-built site from a receiver or administrator?
Is a bridge or development finance better for a part-built scheme?
Can mezzanine be used to complete a stalled scheme?
Working up a scheme?
Share the appraisal as it stands — even in draft. We will look at the capital stack with you before anything goes to a lender.