Development finance for part-complete schemes

When a build has stopped — the lender has stepped back, the money has run out or the contractor has gone — a new facility can repay what is owed and fund the work left to do.

Submit your deal

How cost-to-complete finance works

A part-complete facility does two jobs in one: it repays the existing lender (or funds the purchase of a part-built site) and it provides the money to finish the build, released in stages as a monitoring surveyor signs off the work. It is development finance for a scheme that has already started, rather than for a bare site.

Lenders size it differently from a new-build facility. They look at what the site is worth today in its part-built state, the independent cost to complete, and the value once finished. The day-one advance is limited by the current value; the total facility is limited by loan-to-cost and loan-to-GDV across the whole scheme. Where the senior lender’s limits leave a gap, a mezzanine layer can sit behind it.

These cases are won or lost on information. A quantity surveyor’s cost-to-complete report, a clear explanation of why the scheme stalled, and a contractor who can finish it give a new lender the confidence to move quickly. We help you put that pack together before any lender sees it.

An illustration of how a facility is sized

Illustrative figures only, not a real case: a scheme with a gross development value of £4m stops halfway. The existing lender is owed £1.4m, the site is valued at £1.9m as it stands, and a quantity surveyor puts the cost to complete at £1.3m including contingency.

A new senior lender might advance enough on day one to repay the £1.4m and then fund most of the £1.3m build in stages. If its loan-to-GDV limit stops short of the full amount, mezzanine finance or a further contribution from the developer closes the gap. We model these options with you before approaching lenders, so you know what each one costs.

Typical situations

  • The development lender has stopped funding drawdowns or will not extend
  • The facility has expired or is in default before the build is finished
  • Build costs have risen and the current facility no longer covers them
  • The main contractor has failed and a new contractor must be appointed
  • Buying a part-built site from a developer, a receiver or an administrator
  • Moving from an expensive bridge to a proper development facility mid-build

What lenders will look at

  • An independent cost-to-complete report from a quantity surveyor
  • A valuation of the site as it stands, and of the finished scheme
  • The redemption statement from the existing lender, including any default interest
  • Why the scheme stalled, and what is different now
  • The contractor who will finish the build and the revised programme
  • Planning, building control and warranty position for the work already done

Questions

Frequently asked questions

Will a lender fund a scheme another lender has walked away from?
Often, yes — provided the numbers work today. A new lender will want to understand why the previous lender stepped back, but the decision rests mainly on the current value, the cost to complete and the exit.
Do I need a new cost-to-complete report?
Almost always. New lenders rely on an independent quantity surveyor’s view of the work remaining and its cost. A recent report from a reputable firm, instructed early, is the single most useful document in these cases.
Can the facility cover default interest owed to my current lender?
It can, if the value and margin support it. Default interest increases the amount that has to be repaid, so it reduces the headroom left for the build. Acting before the facility expires keeps that cost down.
Can I buy a part-built site from a receiver or administrator?
Yes. The facility funds the purchase and the remaining build. Lenders will look closely at the condition of the work, warranties and building control sign-off for what has already been built.
Is a bridge or development finance better for a part-built scheme?
If substantial building work remains, development finance with staged drawdowns is usually cheaper and better suited. A bridge can work where only light works remain or where time is extremely short, with a development facility or exit loan to follow.
Can mezzanine be used to complete a stalled scheme?
Yes. Where the senior refinance does not cover the redemption and the cost to complete, a mezzanine lender can provide the difference behind the senior lender, subject to the scheme’s margin and the senior lender’s consent.